Warehouse and AMR Task Instruction
This study describes how a supervisor can direct a fleet of autonomous mobile robots (AMRs) by speaking, using a language model that runs on a local edge node.
| Showcase record | |
|---|---|
| Showcase category | Case studies |
| Industry | Warehouse robotics |
| Published | 5 August 2026 |
This study describes how a supervisor can direct a fleet of autonomous mobile robots (AMRs) by speaking, using a language model that runs on a local edge node.
At a glance
| The problem | Fleets are commanded through fixed workflows and dashboards, so unplanned instructions are slow or need an integrator. |
| The approach | Speech is turned into a structured mission plan, checked against a live registry of robots and locations, and passed to the existing fleet manager. The model never drives a robot, computes a path or overrides a safety stop, and asks when it is unsure. |
| Technology | AMD Kria KR260, Whisper Tiny, a 4-bit quantized language model, a schema-validated mission plan and ROS 2. |
| Measures and results | The study defines what to baseline before a pilot, including instruction volume and fleet idle time. It reports no measured results. |

The Business Problem
How instructions reach robots today
Autonomous mobile robot fleets are commanded through predefined workflows, a warehouse
management system integration, or a custom dashboard built during commissioning. Each of those
works well for the tasks that were anticipated, and poorly for everything else.
The practical consequence is that the operation adapts to the tool rather than the tool adapting to the
operation. A supervisor who wants to sequence two tasks conditionally, or route around a blocked aisle
for the afternoon, or prioritise one dock over another because a truck is late, is either configuring a
workflow or calling an integrator.
Where the cost accumulates
- Configuration effort. Every new task shape becomes an engineering ticket rather than an instruction.
- Training overhead. Each supervisor has to learn a dashboard, and staff turnover in warehousing is high
enough that this is a recurring cost, not a one off. - Under-utilised fleet. Robots idle because expressing the task takes longer than the task.
Integrator dependency. Operational flexibility is gated by a third party’s availability. - Connectivity exposure. Cloud hosted planning stops the floor when the link stops.
What the operator actually wants to say
Supervisor
“Move pallet 23 from Dock 5 to Storage Zone B after charging Robot 4.”
That single sentence contains an entity reference, two locations, a precedence constraint, an implied robot allocation and an implied battery condition. Expressing it in a dashboard takes several screens.Expressing it in speech takes four seconds.
The Requirement in One Sentence
Let the supervisor state the operation in plain speech, convert it into a mission plan that is validated against the real fleet and the real floor, and reject anything that cannot be grounded, all without a network dependency.
Why the edge, specifically
Warehouse floors are radio hostile environments full of metal racking, and site policy frequently forbids operational data leaving the building at all. Running the planning layer on the floor removes both problems, and it also removes the per instruction inference cost that would otherwise scale with throughput
Solution Overview
A single Kria KR260 node on the warehouse network hosts the reasoning and planning layer. It listens to the supervisor, resolves what they said against a live registry of real robots and real locations, produces a structured mission plan, and hands that plan to the existing fleet manager and ROS2 stack+
Layered architecture
| Layer 6 Intent | Speech capture and transcription | Industrial microphone, noise suppression, Whisper Tiny on device. |
| Layer 5 Understanding | 4-bit quantized language model | Resolves entities, sequence, conditions and implied constraints from the utterance. |
| Layer 4 Grounding | Live world model | Registry of robots, docks, racks, zones and their current state, refreshed from the fleet manager. |
| Layer 3 Planning | Deterministic task planner | Dependency ordering, constraint checking, allocation and feasibility. |
| Layer 2 Handoff | Schema validated mission plan | JSON contract, versioned, auditable, rejected if it does not validate. |
| Layer 1 Execution | Fleet manager, ROS2, robot controllers | Unchanged. Navigation, perception and safety behave exactly as they do today. |
The boundary that makes this deployable
The most important design decision in this architecture is what the model is not allowed to do.
| The model does | The model never does |
|---|---|
| Understand operator intent | Drive the robot |
| Resolve names to real entities | Compute a path |
| Order tasks and dependencies | Interpret sensor data |
| Propose an allocation | Override a safety stop |
| Emit a structured plan | Write directly to a controller |
| Ask when uncertain | Guess a destination |
Why this matters commercially
Keeping perception, navigation and safety deterministic means the existing safety case, the existing certification and the existing integrator relationships all stay intact. The language layer is additive. That is what makes it possible to deploy on a live floor rather than in a lab.
Hardware and Sensing
Edge node
| Element | Configuration |
|---|---|
| Platform | AMD Kria KR260 robotics starter kit |
| System on module | Kria K26, Zynq UltraScale+ MPSoC |
| Processors | Quad core Cortex-A53 with dual core Cortex-R5F |
| Memory | 4 GB on-module DDR4 |
| Acceleration | Programmable fabric with DPU for vision and audio offload |
| Networking | Multiple Gigabit Ethernet on the carrier |
| Storage | NVMe or eMMC for model, index and audit log |
Robot side sensing
Where the KR260 is deployed on the robot rather than at a supervisor station, it also carries the perception payload. In the reference design the two roles are separated, with a planning node on the network and perception handled on each robot.
2D and 3D LiDAR
RGB camera
Depth camera
Wheel encoders
IMU
Safety rated laser scanners
Operator station
Industrial noise cancelling microphone
Push to talk headset
Confirmation display or tablet
Optional fixed station microphones per zone
Acoustic conditions drive this choice more than anything else. A warehouse floor typically sits well above conversational noise levels, with reverberation from hard surfaces and racking. A headset with a close talking microphone will outperform a far field array in most facilities, and it also makes it unambiguous who is issuing an instruction.
Design decision to take early
Whether instructions are issued from fixed supervisor stations, from a roaming headset, or from both changes the audio architecture, the authorisation model and the confirmation flow. Decide this before detailed design.
Placement on the network
The planning node sits alongside the fleet manager on the operational network, not on the corporate network and not on the internet. It needs to reach the fleet manager and the message broker. It does not need, and in the reference design does not have, an outbound path
The World Model
A language model that does not know what robots exist will invent one. The world model is the component that prevents that, and it is the difference between a
demonstration and a deployable system.
What it holds
| Entity class | Attributes tracked |
|---|---|
| Robots | Identifier, type, payload capability, current task, battery state, location, availability |
| Docks and bays | Identifier, aliases, current occupancy, access restrictions |
| Racks and storage | Identifier, aisle, level, capacity, current contents where known |
| Zones | Boundaries, access rules, temporary exclusions, speed restrictions |
| Charging points | Identifier, occupancy, compatibility by robot type |
| Loads | Pallet or tote identifiers currently known to the system |
How it stays current
- Subscribed to fleet manager state over MQTT or the site’s existing broker.
- Warehouse management system provides load and location identifiers where an integration exists.
- Staleness is tracked explicitly. An entity whose state is older than a configured threshold is treated as unknown
rather than as last known good. - Aliases are first class. Operators say “the north dock” and “Dock 5” interchangeably, and the registry has to
resolve both.
Grounding contract
Every entity the model names in a plan must resolve to a real record in the world model. There is no path by which an unresolved name reaches the fleet manage
| Condition | Behaviour |
|---|---|
| Name resolves uniquely | Proceed. |
| Name resolves to several entities | Ask the operator to disambiguate, listing the candidates. |
| Name does not resolve | Reject and say so. Never substitute the nearest match. |
| Entity exists but is unavailable | Report why, and offer the feasible alternative if one exists. |
| Entity state is stale | Treat as unknown and request confirmation. |
Fail closed, always
An ambiguous instruction that becomes a wrong movement is far more expensive than an instruction that gets questioned. The system is designed so that uncertainty produces a question, never a guess. Operators tolerate being asked. They do not tolerate a pallet arriving in the wrong aisle.
From Language to Mission Plan
Constrained generation
The model does not write free text that is then parsed. It generates directly into a schema, using grammar constrained decoding so that structurally invalid output is not merely rejected but is impossible to produce
| 01 | Transcript plus world model snapshot | The model is given only the entities that currently exist, not an open vocabulary. |
| 02 | Grammar constrained decoding | Output is forced to conform to the mission plan grammar at generation time. |
| 03 | Schema validation | Types, enumerations, required fields and value ranges checked against the contract. |
| 04 | Semantic validation | Entities must exist, be available, and be compatible with the requested operation. |
| 05 | Operator confirmation | Plan read back in plain language before dispatch, for anything above a configured significance threshold. |
What the model is given
- The transcript.
- A filtered snapshot of currently valid entities.
- The active zone and speed restrictions.
- Nothing else. No site history, no free text, no unbounded context.
Mission plan contract
Why the snapshot reference is in the plan
Recording which world model snapshot the plan was built against makes the whole decision reproducible after the fact. When something goes wrong on a floor, the first question is always what the system believed at the time, and this answers it exactly.
The Task Planner
Why planning is separate from the model
Language models are good at understanding what someone meant. They are unreliable at constraint satisfaction, and unreliable in a way that is hard to test. The planner is therefore a conventional deterministic component that takes the model’s interpretation and turns it into something feasible.
| Planner responsibility | What it checks |
|---|---|
| Dependency ordering | Precedence expressed in the instruction is turned into an acyclic task graph and validated. |
| Feasibility | Is there a robot of the right type, free within the window, able to reach both locations. |
| Battery and duty | Does the assigned robot have enough charge for the full task chain plus a return margin. |
| Zone and access rules | Are all traversals and all destinations permitted for this robot type at this time. |
| Capacity | Does the destination have space, and is the load within payload limits. |
| Conflict | Does this plan contend with an already dispatched plan for the same robot, load or location. |
Allocation
Where the instruction does not name a robot, the planner proposes one. The allocation policy is configuration, not model behaviour, so a site can tune it without retraining anything.
- Nearest suitable robot by travel time rather than by straight line distance.
- Preference for robots already near the pickup, to reduce empty travel.
- Charge state weighted against the length of the task chain.
- Load balancing across the fleet over a shift, so duty cycle stays even
Arbitration stays with the fleet manager
The planner proposes. The existing fleet manager remains the single authority that dispatches, sequences against other traffic and resolves contention. Introducing a second scheduler would be the fastest way to create deadlock on a live floor, so the architecture deliberately avoids it.
Rejection paths
Every rejection is returned to the operator with the specific reason and, where one exists, a feasible alternative. A plan that fails silently is worse than no plan, because the operator believes work is underway.
Inference Stack and Memory Budget
Why four bit
A three billion parameter model at sixteen bit precision needs roughly six gigabytes for weights alone, against four gigabytes available on the module. At four bit the same model comes down to approximately 1.7 gigabytes, leaving room for the speech model, the world model, the index and the operating system.
Throughput is bound by memory bandwidth rather than by arithmetic, because every generated token requires the full weight set to stream out of DDR. Halving the bytes per weight roughly doubles the
achievable token rate
| Component | Allocation |
|---|---|
| Quantized model weights | ~1.7 to 2.2 GB |
| Key value cache at working context | ~150 to 250 MB |
| Speech recognition model | ~75 MB |
| World model and entity index | ~100 to 200 MB |
| Runtime, ROS2 bridge and OS | ~600 to 800 MB |
| Headroom retained | Reserved, not consumed |
The DDR pipeline
Theoretical bandwidth on the module is a ceiling nobody reaches. Closing the gap between theoretical and achieved bandwidth is where the engineering effort actually goes.
Tiling
Weight matrices tiled to on-chip memory
Geometry chosen against available BRAM and URAM.
Double buffering
Transfer overlapped with compute
One tile processed while the next streams in over AXI.
Prefetch
Next layer fetched during the current one
Layer boundaries are the most common stall and are removed deliberately.
On-fabric dequant
Four bit bytes cross the bus
Dequantization after transfer, never before.
Status of figures
Memory allocations and performance characteristics here are design targets for the reference configuration. They are confirmed on customer hardware and workload during the engineering phase.
missingness is information and it is also a trap
In clinical data the absence of a test usually means the clinician did not think it was needed, which carries real signal. It also means a model can learn the local ordering habits of one hospital rather than the physiology, and then fail at the next hospital. Missingness is modelled deliberately and validated across organisations before deployment.
Execution and Robotics Integration
Integration surface
| Component | Role |
|---|---|
| ROS2 | Middleware and node graph across the robot fleet. |
| Nav2 | Path planning, obstacle avoidance and recovery behaviours. |
| MoveIt | Manipulation where the robot carries an arm. |
| VSLAM | Localisation and map maintenance. |
| Object detection | Load identification and pick verification on the DPU. |
| Fleet manager | Dispatch, traffic control and contention resolution. |
| MQTT | State distribution and plan handoff. |
| OPC-UA | Integration with conveyors, doors and fixed automation. |
What stays deterministic
Everything below the mission plan. Localisation, path planning, obstacle avoidance, docking, pick verification and every safety function operate exactly as they did before the language layer was introduced, and they are validated the same way.
Safety architecture
Safety is not implemented in software that a language model can influence. It is implemented where it always was, and the language layer sits entirely outside that boundary
| Safety function | Where it lives |
|---|---|
| Emergency stop | Hardwired, independent of all software. |
| Protective laser scanners | Safety rated devices on the robot, directly interlocked. |
| Speed and separation | Safety controller on the robot. |
| Zone interlocks | Safety PLC on the fixed installation. |
| Traffic management | Fleet manager, unchanged. |
| Mission planning | The only place the language layer participates. |
Standards context
Industrial mobile robot installations are governed by the applicable regional standards for driverless industrial trucks and their systems. Because the language layer cannot reach any safety function, the existing conformity assessment for the installation is unaffected by its introduction. This position is confirmed with the site's safety authority as part of Phase 0.
Worked Example, End to End
Supervisor
“Move pallet 23 from Dock 5 to Storage Zone B after charging Robot 4.”
Step 1 Transcribe
On device speech recognition
Close talking microphone, transcript produced locally.
Step 2 Resolve
Entities matched to the world model
PLT-23 exists at Dock-5. Zone-B exists and has capacity. AMR-04 exists at 38 percent charge.
Step 3 Interpret
Precedence and conditions extracted
Charging must complete before transport begins. Battery check implied by the instruction.
Step 4 Plan
Feasibility and constraints checked
Charge duration estimated, task chain fits the shift, Zone-C exclusion active this afternoon and applied automatically.
Step 5 Confirm
Read back to the operator
Plain language summary, one confirmation, then dispatch.
System
“AMR-04 will charge to 60 percent at station 2, then move pallet 23 from Dock 5 to Zone B, avoiding Zone C. Estimated start in 18 minutes. Confirm?”
And when it cannot be done
| Supervisor | “Move pallet 31 to Rack B5.” |
| System | “Pallet 31 is not currently known at any dock. Rack B5 is full. Did you mean pallet 13, which is at Dock 2?” |
| This is the behaviour that matters most | Two separate failures caught in one turn, both reported specifically, with a grounded suggestion rather than a guess. No plan was dispatched. Systems that get this wrong are not merely unhelpful, they move physical goods to the wrong place. |
Audit, Deployment and Lifecycle
Audit trail
Every instruction produces a record, held locally. This is what makes the system defensible when a movement is questioned weeks later.
| Recorded | Purpose |
|---|---|
| Transcript | What was actually said, as understood. |
| World snapshot reference | What the system believed at that moment. |
| Generated plan | The exact structured output. |
| Validation outcome | Accepted, rejected, or amended, and why. |
| Operator confirmation | Who authorised dispatch. |
| Execution result | Returned from the fleet manager. |
Release management
Model, grammar, schema and application are released as one signed bundle with a single version number. The mission plan schema version travels inside every plan, so a fleet manager receiving a plan always knows which contract it was built against.
Delivery phases
| Phase | Scope | Exit criteria |
|---|---|---|
|
Phase 0 Assessment |
Fleet manager interface review, entity taxonomy, acoustic survey, safety authority engagement. | Agreed schema and integration approach. |
|
Phase 1 Shadow mode |
Plans generated and validated but never dispatched, run alongside existing operation. | Grounding accuracy and rejection behaviour measured against real instructions. |
|
Phase 2 Supervised dispatch |
Plans dispatched with mandatory operator confirmation on every instruction. | Zero ungrounded dispatches over an agreed window. |
|
Phase 3 Routine operation |
Confirmation required only above a significance threshold, tuned per site. | Throughput and instruction latency targets met. |
|
Phase 4 Expansion |
Additional zones, task types, languages and sites. | Repeatable deployment package. |
Benefits and Measurement
Benefits realised
| No operator training | The interface is the operation described in plain speech, so onboarding is close to zero. |
| Faster instruction | Multi step, conditional tasks issued in one utterance instead of several dashboard screens. |
| Less programming effort | New task shapes stop requiring workflow configuration or an integrator ticket. |
| Offline task planning | The floor keeps running when the link to the enterprise or the internet is down. |
| Secure deployment | No operational data, floor layout or inventory position leaves the site. |
| Auditable handoff | Every dispatched plan is a structured, versioned record rather than a free text command. |
| Higher fleet utilisation | Robots idle less because expressing the task is no longer the bottleneck. |
| Predictable cost | Inference is capital rather than a per instruction charge that grows with throughput. |
KPI framework
| Measure | What it tells you |
|---|---|
| Grounding accuracy | Share of instructions correctly resolved to real entities. |
| Ambiguity rate | How often the system has to ask, which should fall as aliases are learned. |
| Ungrounded dispatch count | Must be zero. This is the safety relevant number. |
| Instruction to dispatch time | End to end latency the supervisor experiences. |
| Instructions per shift | Whether the interface is actually being used. |
| Fleet utilisation | Idle time recovered. |
| Configuration tickets raised | Integrator dependency reduced. |
Baseline first
Capture instruction volume, configuration ticket rate and fleet idle time before deployment. Without a baseline the pilot produces numbers that cannot be defended, which is the usual reason a working pilot fails to secure production funding.
Engineering Considerations and Risks
Known hard problems
| Risk | Mitigation |
|---|---|
| Acoustic environment | Acoustic survey in Phase 0, close talking microphones preferred, per zone tuning rather than a single reference setup. |
| Entity drift | Live subscription with explicit staleness handling, and unknown rather than last known good when the threshold is exceeded. |
| Ungrounded dispatch | Grammar constrained generation, schema validation, semantic validation and confirmation, in that order. Four independent gates. |
| Operator trust | Shadow mode before dispatch, so the operation sees the system be right before it is allowed to act. |
| Scheduler conflict | Never introduce a second dispatcher. The fleet manager remains the sole authority. |
| Accent and language variation | Site specific speech tuning, and alias learning from the audit trail rather than from a generic vocabulary. |
| Schema evolution | Version carried inside every plan, with an explicit compatibility policy on the fleet manager side. |
Open questions for the customer
- Which fleet manager is in use, and what interface does it expose for plan submission and state
subscription? - Does a warehouse management system integration exist that can supply load identifiers, or is the world
model limited to fleet state only? - Are instructions issued from fixed stations, roaming headsets, or both?
- What is the authorisation model? Can any operator issue any instruction, or is it role based?
- Which languages and how many sites are in scope for the first release?
- Who is the safety authority for the installation, and what evidence will they want that the language
layer cannot reach a safety function?
Recommended first step
A shadow mode pilot on one zone with one fleet. It generates and validates plans against real instructions without dispatching anything, which produces measured grounding accuracy at effectively zero operational risk, and gives the operation the evidence it needs before anything is allowed to move.
Source
- Tech4Biz Showcase, collected on 26 November 2026.